Completed the Vertical Stabilizer last weekend. It’s exciting to be working aluminum again. I opted to skip (backwards) in the plans rather than dive back into proseal and fuel tanks right off the bat. Since I have the Empenage kit I opted to get started on the vertical stabilizer. Unfortunately, I neglected to take many pictures. I guess that’s a habit to get back into also.
Here is Ashley holding up the clecoed stabilizer skeleton after the first day of building in over 6 months.
and fast forward to the end product, the completed vertical stabilizer
Another note to get out of the way, I have opted not to prime the pieces going forward. This is an item that receives quite a bit of debate but the bottom line is that I live in mostly arid climate and there is little real evidence that I’ve seen that shows corrosion on 2024-T3 aluminum. There are thousands of Cessna aircraft out there built in the 50’s and 60’s with 2024 that were not primed and are flying today. I started the build not knowing for sure which way I would go so I opted for the “may as well prime because I can decide not to later” approach. As I went through the build, I found how much additional time priming took so now is the time that I decide not to.
We are at the point of wiring the tail light and stone from the rudder to the fuselage harness. Do you have any input as to how you route the cable and connector. Thanks